جستجو در کتب و سایت

کتاب : INTEGRATED PROJECT DELIVERY An Action Guide for Leaders

نوشته شده توسط مدیرارشد. منتشر شده در کتابخانه کتب انگلیسی

سال انتشار 2017

کتاب :  INTEGRATED Project DELIVERY

An Action Guide for Leaders
2017
 
 

This guide is the result of a collaborative writing process between five IPD subject-matter experts that made up the guide’s core team. Much of the content found in this guide derived from the conversations that took place at the IPD Advisory Council workshop on May 2, 2017, at the Center for Education and Research in Construction of the Department of Construction Management at the University of Washington. At this workshop, the IPD Advisory Council—a group of nineteen IPD-experienced industry professionals, representing public and private owners, contractors, architects, and trades from across the US and Canada

کتاب : Building Information Modeling Automated Code Checking and Compliance Processes

نوشته شده توسط مدیرارشد. منتشر شده در کتابخانه کتب انگلیسی

سال انتشار 2018
محل انتشار Taylor & Francis Group
نویسندگان nawari

کتاب :  Building Information Modeling Automated Code Checking And Compliance Processes

2018 by Taylor & Francis Group,

 Building Information Modeling

Automated Code Checking and Compliance Processes
2018 by Taylor & Francis Group
 
The advancement of technology has continuously engaged the design profession over the past several centuries. From the ancient Egyptians—who used models in the form of drawings and physical objects, as demonstrated in the plans of the tomb of Rameses IV and the drawing of the shrine from Ghorâb 4000 years ago—to the use of the mouse in the early 1970s, to the development of building information modeling (BIM) in the mid-1990s, technology has had a

کتاب : BIM Collaboration with Autodesk Navisworks

نوشته شده توسط مدیرارشد. منتشر شده در کتابخانه کتب انگلیسی

سال انتشار 2015
محل انتشار G3B Press
نویسندگان Paul F Aubin , Darryl McClelland

کتاب :  BIM Collaboration With Autodesk Navisworks

BIM Collaboration with Autodesk Navisworks 

2015

Paul F Aubin
Darryl McClelland

So you have completed you project model and feel a sense of relief. But should you? What now? What conflicts could be potentially discovered in the field costing you time and money to address? How can you reduce you liability for those errors and/or omissions? Maybe you are responsible for the coordinating all disciplines work for the project. How can this be done and identify potential conflicts before they happen to ensure that the schedule is met? Navisworks can help 

آخرین کتب دیجیتال ( لاتین)

  • کتاب BIM & Construction Management - ویرایش دوم2015 +

    کتاب: BIM and Construction Management  Brad Hardin 364 pages April 2015   Offering practical advice and tested techniques, this book serves مطالعه بيشتر
  • کتاب BIM in Small -Scale Sustainable Design +

    کتاب: BIM in Small - Scale Sustainable Design Francois Levy 312 pages January 2012 "Any architect doing small or medium scaled مطالعه بيشتر
  • کتاب Autodesk Revit Architecture 2015 Official Press +

    کتاب: Autodesk Revit Architecture 2015-No Experience Required- Autodesk Official Press  Eric Wing 1008 pages july 2014 Learn Revit Architecture the مطالعه بيشتر
  • کتاب The implementation of BIM within the public procurement +

    کتاب: The Implementation of BIM within the Public Procurement Marzia Bolpagni 2013   Recently more and more Public Sectors have مطالعه بيشتر
  • کتاب BIM for Dummies +

    کتاب: BIM for dummies بهترین کتاب آموزش BIM به گفته افراد متولی و صاحب نظر برای تازه ورود کرده ها مطالعه بيشتر
  • 1

آخرین مقالات دیجیتال ( انگلیسی)

  • مقاله BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): an innovation diffusion model +

    مقاله: BIM Adoption Within Australian Small And مطالعه بيشتر
  • Sustainable Delivery of Megaprojects in Iran: Integrated Model of Contextual Factors +

    مقاله:  Sustainable Delivery of MegaProjects in Iran: مطالعه بيشتر
  • Daylighting and visual comfort of oriental sun responsive skins: A parametric analysis +

    مقاله:  ِDaylighting and Visual Comfort of Oriental مطالعه بيشتر
  • Integration of parametric design into modular coordination: A construction waste reduction workflow +

    مقاله: Integration Of Parametric Design into Modular Coordination مطالعه بيشتر
  • How BIM increased project safety and improved profitability for building owners and investors +

    مقاله: How BIM increased project safety and improved مطالعه بيشتر
  • 1

تماس با ما

راه های ارتباطی با گروه Iran Intelligent BIM solutions (بنا یار مهراز ایرانیان)

با ما در تماس باشید